{"id":1071,"date":"2026-10-23T08:52:31","date_gmt":"2026-10-23T08:52:31","guid":{"rendered":"https:\/\/es-blog.esigns.com\/blog\/?p=1071"},"modified":"2026-11-17T11:15:19","modified_gmt":"2026-11-17T11:15:19","slug":"how-to-set-up-zephyr-x-stands","status":"publish","type":"post","link":"https:\/\/www.esigns.com\/blog\/how-to-set-up-zephyr-x-stands\/","title":{"rendered":"How To Set Up Zephyr X-Stands"},"content":{"rendered":"<main id='bde-main'><section class=\"bde-section-1071-100 bde-section\">\n  \n  \n\t\n\n\n\n<div class=\"section-container\"><h2 class=\"bde-heading-1071-101 bde-heading\">\nZEPHYR X-STAND SET-UP GUIDE (1-SIDED)\n<\/h2><div class=\"bde-rich-text-1071-102 bde-rich-text breakdance-rich-text-styles\">\n<p><strong>01 - <\/strong>Contents: One [1] telescopic pole with two [2] rods, one [1] bottom crossbeam with wire attached to plastic piece, and one [1] stand base.<\/p>\n<\/div><\/div>\n<\/section><section class=\"bde-section-1071-103 bde-section\">\n  \n  \n\t\n\n\n\n<div class=\"section-container\"><img decoding=\"async\" class=\"bde-image2-1071-104 bde-image2\" src=\"https:\/\/www.esigns.com\/blog\/wp-content\/uploads\/2026\/11\/ZX1-00.png\" alt=\"ZX1-00\" loading=\"lazy\" sizes=\"(max-width: 268px) 100vw, 268px\"><\/div>\n<\/section><section class=\"bde-section-1071-105 bde-section\">\n  \n  \n\t\n\n\n\n<div class=\"section-container\"><div class=\"bde-rich-text-1071-106 bde-rich-text breakdance-rich-text-styles\">\n<p><strong>02 - <\/strong>If the plastic piece attached by wire to the crossbeam is not already attached to the base, turn the base over, then slide the rounded end of the plastic piece into the slot on the underside of base.<\/p><p><strong>03 - <\/strong>Turn base right side up, remove the blue cap. Fill the base with ballast (sand, water, or something similar) and then replace the blue cap.<\/p><p><strong>04 - <\/strong>Insert the telescoping pole into the open hole located near top-rear of base.<\/p>\n<\/div><\/div>\n<\/section><section class=\"bde-section-1071-107 bde-section\">\n  \n  \n\t\n\n\n\n<div class=\"section-container\"><img decoding=\"async\" class=\"bde-image2-1071-108 bde-image2\" src=\"https:\/\/www.esigns.com\/blog\/wp-content\/uploads\/2026\/11\/ZX1-01.png\" alt=\"ZX1-01\" loading=\"lazy\" sizes=\"(max-width: 119px) 100vw, 119px\"><\/div>\n<\/section><section class=\"bde-section-1071-109 bde-section\">\n  \n  \n\t\n\n\n\n<div class=\"section-container\"><div class=\"bde-rich-text-1071-110 bde-rich-text breakdance-rich-text-styles\">\n<p><strong>05 - <\/strong>Extend the lower cross beam and adjust length as needed to match the width of your banner.<\/p>\n<\/div><\/div>\n<\/section><section class=\"bde-section-1071-111 bde-section\">\n  \n  \n\t\n\n\n\n<div class=\"section-container\"><img decoding=\"async\" class=\"bde-image2-1071-112 bde-image2\" src=\"https:\/\/www.esigns.com\/blog\/wp-content\/uploads\/2026\/11\/ZX1-02.png\" alt=\"ZX1-02\" loading=\"lazy\" sizes=\"(max-width: 266px) 100vw, 266px\"><\/div>\n<\/section><section class=\"bde-section-1071-113 bde-section\">\n  \n  \n\t\n\n\n\n<div class=\"section-container\"><div class=\"bde-rich-text-1071-114 bde-rich-text breakdance-rich-text-styles\">\n<p><strong>06 - <\/strong>Attach the banner to the two [2] hooks at the top of the stand first.<\/p>\n<\/div><\/div>\n<\/section><section class=\"bde-section-1071-115 bde-section\">\n  \n  \n\t\n\n\n\n<div class=\"section-container\"><img decoding=\"async\" class=\"bde-image2-1071-116 bde-image2\" src=\"https:\/\/www.esigns.com\/blog\/wp-content\/uploads\/2026\/11\/ZX1-03.png\" alt=\"ZX1-03\" loading=\"lazy\" sizes=\"(max-width: 119px) 100vw, 119px\"><\/div>\n<\/section><section class=\"bde-section-1071-117 bde-section\">\n  \n  \n\t\n\n\n\n<div class=\"section-container\"><div class=\"bde-rich-text-1071-118 bde-rich-text breakdance-rich-text-styles\">\n<p><strong>07 - <\/strong>Attach the bottom of banner to the two hooks on the crossbeam previously connected to the base.<\/p>\n<\/div><\/div>\n<\/section><section class=\"bde-section-1071-119 bde-section\">\n  \n  \n\t\n\n\n\n<div class=\"section-container\"><img decoding=\"async\" class=\"bde-image2-1071-120 bde-image2\" src=\"https:\/\/www.esigns.com\/blog\/wp-content\/uploads\/2026\/11\/ZX1-04.png\" alt=\"ZX1-04\" loading=\"lazy\" sizes=\"(max-width: 269px) 100vw, 269px\"><\/div>\n<\/section><section class=\"bde-section-1071-121 bde-section\">\n  \n  \n\t\n\n\n\n<div class=\"section-container\"><div class=\"bde-rich-text-1071-122 bde-rich-text breakdance-rich-text-styles\">\n<p><strong>08 - <\/strong>Twist knob on the pole counter-clockwise to unlock the telescoping pole and adjust the pole upwards until the banner becomes taut. Secure the banner by turning the knob clockwise until it locks into position.<\/p>\n<\/div><\/div>\n<\/section><section class=\"bde-section-1071-123 bde-section\">\n  \n  \n\t\n\n\n\n<div class=\"section-container\"><img decoding=\"async\" class=\"bde-image2-1071-124 bde-image2\" src=\"https:\/\/www.esigns.com\/blog\/wp-content\/uploads\/2026\/11\/ZX1-05.png\" alt=\"ZX1-05\" loading=\"lazy\" sizes=\"(max-width: 119px) 100vw, 119px\"><\/div>\n<\/section><section class=\"bde-section-1071-125 bde-section\">\n  \n  \n\t\n\n\n\n<div class=\"section-container\"><div class=\"bde-rich-text-1071-126 bde-rich-text breakdance-rich-text-styles\">\n<p><strong>09 - <em>YOUR SINGLE-SIDED ZEPHYR-X BANNER STAND IS READY TO USE!<\/em><\/strong><\/p>\n<\/div><\/div>\n<\/section><section class=\"bde-section-1071-127 bde-section\">\n  \n  \n\t\n\n\n\n<div class=\"section-container\"><img decoding=\"async\" class=\"bde-image2-1071-128 bde-image2\" src=\"https:\/\/www.esigns.com\/blog\/wp-content\/uploads\/2026\/11\/ZX1-06.png\" alt=\"ZX1-06\" loading=\"lazy\" srcset=\"https:\/\/www.esigns.com\/blog\/wp-content\/uploads\/2026\/11\/ZX1-06.png 332w, https:\/\/www.esigns.com\/blog\/wp-content\/uploads\/2026\/11\/ZX1-06-285x300.png 285w\" sizes=\"(max-width: 332px) 100vw, 332px\"><\/div>\n<\/section><section class=\"bde-section-1071-129 bde-section\">\n  \n  \n\t\n\n\n\n<div class=\"section-container\"><h2 class=\"bde-heading-1071-130 bde-heading\">\nZEPHYR X-STAND SET-UP GUIDE (2-SIDED)\n<\/h2><div class=\"bde-rich-text-1071-131 bde-rich-text breakdance-rich-text-styles\">\n<p><strong>01 - <\/strong>Contents: One [1] large pole, one [1] small pole with rod holders, two [2] rods with double hooks, and four [4] rods with single hooks.<\/p>\n<\/div><\/div>\n<\/section><section class=\"bde-section-1071-132 bde-section\">\n  \n  \n\t\n\n\n\n<div class=\"section-container\"><img decoding=\"async\" class=\"bde-image2-1071-133 bde-image2\" src=\"https:\/\/www.esigns.com\/blog\/wp-content\/uploads\/2026\/11\/ZX2-00.png\" alt=\"ZX2-00\" loading=\"lazy\" sizes=\"(max-width: 268px) 100vw, 268px\"><\/div>\n<\/section><section class=\"bde-section-1071-134 bde-section\">\n  \n  \n\t\n\n\n\n<div class=\"section-container\"><div class=\"bde-rich-text-1071-135 bde-rich-text breakdance-rich-text-styles\">\n<p><strong>02 - <\/strong>Remove the blue cap. Fill the base with ballast (sand, water, or something similar) and then replace the blue cap.<\/p><p><strong>03 - <\/strong>Insert the small pole with rod holders into the end of the large pole with the recessed plastic end piece.<\/p><p><strong>04 - <\/strong>Insert the previously-assembled pole into the open hole located near the rear of the base.<\/p>\n<\/div><\/div>\n<\/section><section class=\"bde-section-1071-136 bde-section\">\n  \n  \n\t\n\n\n\n<div class=\"section-container\"><img decoding=\"async\" class=\"bde-image2-1071-137 bde-image2\" src=\"https:\/\/www.esigns.com\/blog\/wp-content\/uploads\/2026\/11\/ZX2-01.png\" alt=\"ZX2-01\" loading=\"lazy\" sizes=\"(max-width: 119px) 100vw, 119px\"><\/div>\n<\/section><section class=\"bde-section-1071-138 bde-section\">\n  \n  \n\t\n\n\n\n<div class=\"section-container\"><div class=\"bde-rich-text-1071-139 bde-rich-text breakdance-rich-text-styles\">\n<p><strong>05 - <\/strong>Insert one of the double hook rods into the circular plastic rod holder (with only two holes) at the top of pole.<\/p>\n<\/div><\/div>\n<\/section><section class=\"bde-section-1071-140 bde-section\">\n  \n  \n\t\n\n\n\n<div class=\"section-container\"><img decoding=\"async\" class=\"bde-image2-1071-141 bde-image2\" src=\"https:\/\/www.esigns.com\/blog\/wp-content\/uploads\/2026\/11\/ZX2-02.png\" alt=\"ZX2-02\" loading=\"lazy\" sizes=\"(max-width: 119px) 100vw, 119px\"><\/div>\n<\/section><section class=\"bde-section-1071-142 bde-section\">\n  \n  \n\t\n\n\n\n<div class=\"section-container\"><div class=\"bde-rich-text-1071-143 bde-rich-text breakdance-rich-text-styles\">\n<p><strong>06 - <\/strong>Insert the remaining four rods into the other rod holder (the one with four holes).<\/p>\n<\/div><\/div>\n<\/section><section class=\"bde-section-1071-144 bde-section\">\n  \n  \n\t\n\n\n\n<div class=\"section-container\"><img decoding=\"async\" class=\"bde-image2-1071-145 bde-image2\" src=\"https:\/\/www.esigns.com\/blog\/wp-content\/uploads\/2026\/11\/ZX2-03.png\" alt=\"ZX2-03\" loading=\"lazy\" sizes=\"(max-width: 119px) 100vw, 119px\"><\/div>\n<\/section><section class=\"bde-section-1071-146 bde-section\">\n  \n  \n\t\n\n\n\n<div class=\"section-container\"><div class=\"bde-rich-text-1071-147 bde-rich-text breakdance-rich-text-styles\">\n<p><strong>07 - <\/strong>Attach the first banner to the top of the stand. Repeat by attaching the second banner in the same way.<\/p>\n<\/div><\/div>\n<\/section><section class=\"bde-section-1071-148 bde-section\">\n  \n  \n\t\n\n\n\n<div class=\"section-container\"><img decoding=\"async\" class=\"bde-image2-1071-149 bde-image2\" src=\"https:\/\/www.esigns.com\/blog\/wp-content\/uploads\/2026\/11\/ZX2-04.png\" alt=\"ZX2-04\" loading=\"lazy\" sizes=\"(max-width: 269px) 100vw, 269px\"><\/div>\n<\/section><section class=\"bde-section-1071-150 bde-section\">\n  \n  \n\t\n\n\n\n<div class=\"section-container\"><div class=\"bde-rich-text-1071-151 bde-rich-text breakdance-rich-text-styles\">\n<p><strong>08 - <\/strong>Attach the bottom of both banners to the rods at the bottom of the stand.<\/p>\n<\/div><\/div>\n<\/section><section class=\"bde-section-1071-152 bde-section\">\n  \n  \n\t\n\n\n\n<div class=\"section-container\"><img decoding=\"async\" class=\"bde-image2-1071-153 bde-image2\" src=\"https:\/\/www.esigns.com\/blog\/wp-content\/uploads\/2026\/11\/ZX2-05.png\" alt=\"ZX2-05\" loading=\"lazy\" sizes=\"(max-width: 119px) 100vw, 119px\"><\/div>\n<\/section><section class=\"bde-section-1071-154 bde-section\">\n  \n  \n\t\n\n\n\n<div class=\"section-container\"><div class=\"bde-rich-text-1071-155 bde-rich-text breakdance-rich-text-styles\">\n<p><strong>09 - <\/strong>Once both banners are attached, press the button on the shaft of small pole to release the mechanism, and then slide the mechanism downwards until the banner becomes taut and you hear the mechanism lock into place.<\/p>\n<\/div><\/div>\n<\/section><section class=\"bde-section-1071-156 bde-section\">\n  \n  \n\t\n\n\n\n<div class=\"section-container\"><img decoding=\"async\" class=\"bde-image2-1071-157 bde-image2\" src=\"https:\/\/www.esigns.com\/blog\/wp-content\/uploads\/2026\/11\/ZX2-06.png\" alt=\"ZX2-06\" loading=\"lazy\" sizes=\"(max-width: 271px) 100vw, 271px\"><\/div>\n<\/section><section class=\"bde-section-1071-158 bde-section\">\n  \n  \n\t\n\n\n\n<div class=\"section-container\"><div class=\"bde-rich-text-1071-159 bde-rich-text breakdance-rich-text-styles\">\n<p><strong>10 - <em>YOUR DOUBLE-SIDED ZEPHYR-X BANNER STAND IS READY TO USE!<\/em><\/strong><\/p>\n<\/div><\/div>\n<\/section><section class=\"bde-section-1071-160 bde-section\">\n  \n  \n\t\n\n\n\n<div class=\"section-container\"><img decoding=\"async\" class=\"bde-image2-1071-161 bde-image2\" src=\"https:\/\/www.esigns.com\/blog\/wp-content\/uploads\/2026\/11\/ZX2-07.png\" alt=\"ZX2-07\" loading=\"lazy\" srcset=\"https:\/\/www.esigns.com\/blog\/wp-content\/uploads\/2026\/11\/ZX2-07.png 153w, https:\/\/www.esigns.com\/blog\/wp-content\/uploads\/2026\/11\/ZX2-07-142x300.png 142w\" sizes=\"(max-width: 153px) 100vw, 153px\"><\/div>\n<\/section><\/main>","protected":false},"excerpt":{"rendered":"<p>ZEPHYR X-STAND SET-UP GUIDE (1-SIDED) 01 &#8211; Contents: One [1] telescopic pole with two [2] rods, one [1] bottom crossbeam with wire attached to plastic piece, and one [1] stand base. 02 &#8211; If the plastic piece attached by wire to the crossbeam is not already attached to the base, turn the base over, then [&hellip;]<\/p>\n","protected":false},"author":8,"featured_media":1404,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_breakdance_hide_in_design_set":false,"_breakdance_tags":"","footnotes":""},"categories":[12],"tags":[],"class_list":["post-1071","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mount-and-maintain"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.esigns.com\/blog\/wp-json\/wp\/v2\/posts\/1071","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.esigns.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.esigns.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.esigns.com\/blog\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.esigns.com\/blog\/wp-json\/wp\/v2\/comments?post=1071"}],"version-history":[{"count":2,"href":"https:\/\/www.esigns.com\/blog\/wp-json\/wp\/v2\/posts\/1071\/revisions"}],"predecessor-version":[{"id":1278,"href":"https:\/\/www.esigns.com\/blog\/wp-json\/wp\/v2\/posts\/1071\/revisions\/1278"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.esigns.com\/blog\/wp-json\/wp\/v2\/media\/1404"}],"wp:attachment":[{"href":"https:\/\/www.esigns.com\/blog\/wp-json\/wp\/v2\/media?parent=1071"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.esigns.com\/blog\/wp-json\/wp\/v2\/categories?post=1071"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.esigns.com\/blog\/wp-json\/wp\/v2\/tags?post=1071"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}